Use
For account assignments to be performed, cost elements are required to which the postings can be made. This example uses cost element 282500 for revenues and cost element 232500 for costs. These cost elements have been combined into a cost element group (OAS_PRD) and are assigned to the corresponding PA transfer structure.
In this scenario, you make the necessary settings for activating direct account assignment.
Procedure
Menu Path |
Tools ® AcceleratedSAP ® Customizing ® Edit Project |
Transaction Code |
SPRO |
Menu Path |
Controlling ® Profitability Analysis ® Flows of Actual Values ® Direct Posting From FI/MM ® |
Transaction Code |
OKB9 |

If you are executing a profitability analysis transaction for the first time since logging on, the Set operating concern dialog box appears.
Field |
Data |
Operating concern |
IDEA |
Type of Profitability Analysis |
Costing-based |
In the next screen, you see that the two cost elements 232500 and 282500 are selected in the profitability segment (PrfSeg) column. With this selection, the posting is made directly to Profitability Analysis.