Show TOC
Engineering Change Management: New Change
Objects
Description
In release 3.0, the range of SAP Objects that can be changed with history
has been extended.
You can now change the following objects with reference to a change master
record:
- Functional location task lists
Previously, you could not create an object
management record for a document. Now you can - this means that you can now
use more engineering change management functions for documents. For example,
you can assign a document to an alternative date.
You can also assign a revision level to a change status of a document.
You have two options for changing material
master records with reference to a change number:
- If you change the material master record using the transaction
"Change material master record", the valid-from date of the change master
record cannot be in the future. The changes made will be valid either
immediately (as of the current date) or as of a date in the past.
- If you want to schedule changes to a material master record, you can use
the function "Schedule material change". The valid-from date of the change
master record cannot be in the past. In this case, the changes become valid on
a particular date in the future.
The changes made are logged in a change
document. From the processing functions for the material master record, you
can display a list of all change documents that document changes made to the
material with reference to a change number. To see detailed information on the
changes made, select the appropriate pushbutton.
You can also assign a revision level to specific statuses of a material.
You can change some objects with reference to a change master record
without individual object management records being created in the change
master record. For this reason, some functions of engineering change
management are not available for these objects. These functions include
allocation to alternative dates and controlling the processing flow via the
user status.
If you enter a change number for these change objects, the system takes the
valid-from date from the header of the change master record. Functionally
linked objects (such as material, BOM, routing, document, and class) are
thereby grouped together in one change number.
You can enter a change number for this purpose for the following objects:
If you want to enter these objects as change objects for a change master
record, the valid-from date of the change master must not be in the past.
Change system parameters in customizing
If you want to assign a revision level to specific processing statuses of a
material or document, first you have to define the revision levels for these
objects.
To do this, proceed as follows:
Define revision levels for materials
Define revision levels for documents