Change Status Selection 

Use

To use engineering change management, the data records in the R/3 component Product Safety can have different validity periods.

The following data records can have different validity periods:

If the dangerous goods master is to be filled with data with several validity periods, each valid from or valid to date causes the resulting data record to be split in the dangerous goods master.

Prerequisites

If you use change numbers in the R/3 substance database, and want to transfer the data to the dangerous goods master, you must have set the Active indicator for the corresponding change numbers for the following object types:

Features

The R/3 System takes changes into account that

Changes that were made with change numbers cause data records to be split (data record change).

Changes that were made without change numbers refer to the attributes within a data record. Attribute changes are logged by the R/3 System in change documents. The date of the last change also provides information about a change that has actually been made.

Activities

For data record changes, the R/3 System determines the validity period of the resulting data record in the dangerous goods master as follows:

Determination of the Valid-from and Valid-to Date

The R/3 System determines the valid-from date independent of the valid-to date.

The data record is only transferred to the dangerous goods master if a unique logical key can be allocated from material and dangerous goods regulation. The determination of the new validity period with which the data record is created in the dangerous goods master is thus dependent on whether