Inspection Lot Processing 

  1. Call up the transaction as follows:
  2. Menu Path

    From the Quality Inspection node, choose Worklist ® Variants for Results Recording ® For All Inspection Lots

    Transaction Code

    QE72

  3. Enter the following data:
  4. Field

    Data

    Plant

    1000

    Inspection lot origin

    09

    Material

    QS8X35

  5. Choose .
  6. The worklist for results recording appears containing both of your previously created inspection lots.

  7. Choose and then choose .
  8. An overview of the inspection lots and inspection characteristics appears in matrix form, with the inspection lots on the horizontal axis and the inspection characteristics on the vertical axis.

    The inspection characteristic Electroplating is a long-term characteristic which means that its values are determined using a long-term inspection. You therefore only enter the results for the inspection characteristic threaded length and make usage decisions for the inspection lots in advance. You only enter results for the long-term characteristic after the long-term inspection has been completed and then you post the inspection completion.

  9. Enter the following data for the inspection characteristic threaded length:
  10. Field

    Data

    Result (first inspection lot)

    34.9

    Result (second inspection lot)

    35.1

  11. Choose Save and then choose .
  12. The system uses icons to show that the values you entered have been accepted.

  13. Choose until the inspection lot overview appears.
  14. Select the first inspection lot and choose Usage decision (UD).
  15. The system warns you that the long-term characteristic Electroplating is still open.

  16. Choose Batch status.
  17. Change the batch status from restricted-use stock to unrestricted-use stock and choose .
  18. Enter the following data:
  19. Field

    Data

    UD Code

    A2 (possible entries help)

  20. Choose .
  21. The usage decision is saved to the database. The batch is classified.

  22. Choose until the inspection lot overview appears.
  23. Select the second inspection lot and choose Usage decision.
  24. Repeat steps 9 to 12 for the second inspection lot.
  25. Choose until the overview tree appears.