Executing Allocation Cycles 

Use

You can execute the allocation cycle in two different ways:

Line item records are always written to the database when an allocation cycle is executed.

Prerequisites

You created an allocation cycle. For more information, see Creating Allocation Cycles

You selected Accounting ® Financial Accounting ® Special Purpose Ledger ® Periodic Processing ® Allocation and then chose Actual/Plan Assessment or Actual/Plan Distribution ® Create.

You can, though, also reach the screen for execution of allocation cycles this way:

The system displays the FI-SL: Execute <Allocation Type>: Initial Screen.

Features

a) Process control

With Process control, you can determine how the allocation cycle is carried out and which information is displayed by the system:

Choose

Function

Process control ® Background processing

Processing runs in the background.

Process control ® Test run

The system only generates a log. No data is changed, no new data is written to the database.

Process control ® Detail lists

List selection is prepared.

Process control ® Detail lists ® List selection

Basic list is configured. The sender and receiver list information and the journal information can be displayed.

b) Settings

You can use Settings to determine the functions that the system takes into consideration during execution. For more information, see Settings for Execution of Cycles.

c) Goto

Use Goto to display previous processing. For more information, see Displaying Previous Processing. You can check whether an allocation cycle has already been processed for a ledger within a specific period.

d) Extras

This value specifies from which period the values are added up to calculate the tracing factors and the values to be allocated in the current processing period. Normally this is period 1. With the special purpose ledgers, the start period can also be zero.

You can get an overview of the current status of allocation execution with Selection criteria, cycle information, and previous processing.

To execute cycles of an allocation type in parallel, these have to be assigned to various cycle run groups.

e) Execute

After you have entered all relevant data and have made all appropriate settings, choose .

The Display <Allocation Type>: Basic List screen appears. Use the basic list to check the processing results.

For more information, see Displaying Allocation Results.