Stock Transfer from Plant to MRP Area 

Use

Integration

The process is the same as for Storage Location MRP. In contrast to the storage location MRP, you can use all MRP procedures and are not limited to the reorder point planning procedure.

Prerequisites

Features

During MRP, the system generates a stock transfer reservation for the material in the MRP area and a material reservation in the plant MRP area.

The external procurement storage location that you have entered in the MRP area segment of the material master is used as the receiving storage location. If you have not maintained this field, the system uses the receiving storage location that you entered for the MRP area in Customizing.

The actual procurement is processed by the plant. With stock transfer to the MRP area, you carry out the transfer posting for the material with reference to the reservation.