Backflushing for the Second Reporting Point  

Use

You are now at the second reporting point. Up to now you have only manufactured 110 of the 130 units that reached the first reporting point. 10 were separated out as scrap and 10 units have still to be manufactured. These 10 remaining units constitute work in process (WIP), and this is determined in one of the following processes.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    Logistics ® Production ® Repetitive Manufacturing ® Backflush ® REM Backflush

    Transaction Code

    MFBF

    If you have not yet switched to yield backflush, choose Yield.

  3. Enter the following data:
  4. Field

    Europe

    North America

    Backflush quantity

    110

    110

    Posting date

    Current date

    Current date

    Document date

    Current date

    Current date

  5. On the Make-to-stock tab page, enter the following data:
  6. Field

    Europe

    North America

    Material

    C-1113

    C-1113

    Plant

    1200

    3200

    Production version

    0001

    0001

    RP backflush

    Select

    Select

    Reporting point

    0030

    0030

  7. Choose Post with Correction.
  8. On the REM Backflush – Transaction Variant: None screen select material R-1220.
  9. Choose Edit ® Delete.
  10. Enter the following data:
  11. Field

    Europe

    North America

    Material

    C-1230

    C-1230

    Quantity

    110

    110

    Plant

    1200

    3200

    Storage location

    0001

    0001

  12. Choose Actual activities.
  13. In the Operation Selection for Backflushing Actual Activities dialog box select your operation and choose .
  14. You can find additional information for analyzing the costs posted here under Analyzing the Costs for the Product Cost Collector.

  15. Choose .
  16. Choose until the overview tree appears.