Backflushing for the First Reporting Point
Use
In this process step, you use two reporting points. At the first reporting point confirm the production quantity of 130 units. At this reporting point you only need parts R-1210, R-1230 and R1242. When you later continue production you will establish that part R-1220 is defective. However, you have already used 10 units for part R-1220 in the assembly and consequently have to scrap the 10 assembly groups concerned. You substitute R-1220 with part C-1230. Finally, at the second reporting point you confirm 110 units and categorize 10 units as work in process (130 units at reporting point 0010 less 10 units scrap, less 110 units at reporting point equals 10 units work in process).
In this process the confirmation of 130 units is displayed that have been executed prior to the first reporting point (milestone), and also the change to the input quantity of component R-1210.
Procedure
Menu Path |
Logistics ® Production ® Repetitive Manufacturing ® Backflush ® REM Backflush |
Transaction Code |
MFBF |
Field |
Europe |
North America |
Assembly backflush |
Select |
Select |
Backflush quantity |
130 |
130 |
Posting date |
Current date |
Current date |
Document date |
Current date |
Current date |
Field |
Europe |
North America |
Material |
C-1113 |
C-1113 |
Plant |
1200 |
3200 |
Production version |
0001 |
0001 |
RP backflush |
Select |
Select |
Reporting point |
0010 |
0010 |
The components for material C-1113 are displayed.
Field |
Europe |
North America |
Quantity |
65 |
65 |
Field |
Europe |
North America |
Machine |
Select |
Select |
To be backflushed |
5 |
5 |
Activity type |
1420 |
1420 |
The system displays the message: GI posted with document XXX and activities.