Backflushing for the First Reporting Point  

Use

In this process step, you use two reporting points. At the first reporting point confirm the production quantity of 130 units. At this reporting point you only need parts R-1210, R-1230 and R1242. When you later continue production you will establish that part R-1220 is defective. However, you have already used 10 units for part R-1220 in the assembly and consequently have to scrap the 10 assembly groups concerned. You substitute R-1220 with part C-1230. Finally, at the second reporting point you confirm 110 units and categorize 10 units as work in process (130 units at reporting point 0010 less 10 units scrap, less 110 units at reporting point equals 10 units work in process).

In this process the confirmation of 130 units is displayed that have been executed prior to the first reporting point (milestone), and also the change to the input quantity of component R-1210.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    Logistics ® Production ® Repetitive Manufacturing ® Backflush ® REM Backflush

    Transaction Code

    MFBF

  3. Enter the following data:
  4. Field

    Europe

    North America

    Assembly backflush

    Select

    Select

    Backflush quantity

    130

    130

    Posting date

    Current date

    Current date

    Document date

    Current date

    Current date

  5. On the Make-to-stock tab page, enter the following data:
  6. Field

    Europe

    North America

    Material

    C-1113

    C-1113

    Plant

    1200

    3200

    Production version

    0001

    0001

    RP backflush

    Select

    Select

    Reporting point

    0010

    0010

  7. Choose Post with Correction.
  8. The components for material C-1113 are displayed.

  9. Make the following change in the line for material R-1210:
  10. Field

    Europe

    North America

    Quantity

    65

    65

  11. Choose Actual activities.
  12. In the Reporting Point Backflush dialog box select the first operation and choose .
  13. In the Posting actual activities screen the confirmation data is proposed. Change the required machine time, then enter the following data:
  14. Field

    Europe

    North America

    Machine

    Select

    Select

    To be backflushed

    5

    5

    Activity type

    1420

    1420

  15. Choose .
  16. The system displays the message: GI posted with document XXX and activities.

  17. Choose until the overview tree appears.