Additional Process Information 

The product cost collector used in product cost by period is created on the material/plant/production process level, meaning the production process is specified dependent on a controlling level. In this process (product cost by period with the repetitive manufacturing production category) the controlling level determines the characteristics material/plant/production process.

In this process the preliminary costing for the product cost collector is used to

The following additional information is aimed at IDES users with prior knowledge of Customizing for Cost Object Controlling.

You specify the settings for valuating the product cost collector for both the preliminary costing and the actual confirmations in the valuation variants. You assign these to this using the order type of the product cost collector. To check the settings choose:

Menu Path

Tools ® AcceleratedSAP ® Customizing ® Edit Project ® Choose SAP Reference IMG ® Controlling ® Product Cost Controlling ® Cost Object Controlling ® Product Cost by Period ® Product Cost Collectors ® Check Valuation Variants for Product Cost Collectors.

Transaction Code

OPN2