Displaying the Definition of a Costing Sheet 
Use
The following steps explain the customizing settings, and are intended for display purposes. For this reason, you are requested not to change any data.
Procedure
Menu Path |
Tools ® AcceleratedSAP ® Customizing ® Edit Project |
Transaction Code |
SPRO |
SAP Reference IMG.
in front of Maintain Costing Sheets.
:Field |
Data |
Controlling area |
1000 |
You can see cost elements 400000 - 419000 have been specified as the base.
, until the Change View "Costing Sheet Rows": Overview screen appears.You see detailed information on the overhead rate. The columns Valid from and To show the period in which the overhead rate is valid. This enables you to define various periods for different overhead rates. In the CO area column, you define the controlling area for which the overhead is valid. In the Ovrhd type column, you define whether the overhead rate refers to Actual (1), Planned (2) or Commitment (3) values. A percentage-based overhead rate of 5% is defined for every row (actual and planned values).
.
:Field |
Data |
Controlling area |
1000 |
The overview shows that the overhead rate is allocated using cost element 655100 and is credited to cost center 4130. The * value in the Fixed % column shows that the costs credited to the credit object are distributed in the same way (by fixed and variable portions) as the overhead allocation on the debited object.
until the overview tree appears.