Displaying a Cycle for Assessment 
Menu Path |
Tools ® AcceleratedSAP ® Customizing ® Edit Project |
Transaction Code |
KSU8 |
SAP Reference IMG.
Define Assessment.
Choose.
:Field |
Europe |
North America |
Controlling area |
1000 |
2000 |
Field |
Europe |
North America |
Cycle |
I-AP-2 |
I-AP-4 |
Starting date |
01.01.1995 |
01.01.1995 |
.The system displays the header data of the assessment cycle. You create settings that are the same for all segments (assessment definition per sender). In addition to fields such as currency, you can also define that (plan) version 0 is to be used for the distribution.
.You can see which areas are to be allocated using distribution (in this example, only the Telephone cost center).
.It is defined here that the cost element is to be allocated 100% (as planned) to the receivers based on variable portions. The variable portions in this example are the statistical key figures for installed telephones, which are recorded on the receiver objects. Assessment cost element 631500 is used for the allocation.
This shows the sender and receiver cost centers that were specified. The sender is the telephone cost center (2-1210 in Germany, 4-1210 in the US). All the cost elements for this cost center are allocated.
The system displays the drilldown for the receiver cost center set. This contains all cost centers of company code 2000 (4000) where assessment is made. Note that the sender cost center is not included, because it can not be a receiver. Which cost centers will actually be receivers depends on whether they contain the assessment tracing factor. We highlight the distribution tracing factor for this process in the next process step.
.Under Selection criteria area, you see that statistical key figure 9202 (telephones) has been used as the basis for the assessment. This statistical key figure is planned on the receiver cost centers and posted in the actual version. It represents the number of telephones on by the receiver cost centers.
until the overview tree appears.If you are asked whether you want to save the processed cycle when you return to the dialog box, choose No.