Assigning Switching Structures in Activity Type Planning 
Use
This displays the assignment of a switching structure within activity type planning. The cost component structure was assigned to a plan version, and is therefore valid for all cost centers. You can also use the switching structure to make a differentiated assignment of costs to cost components for each cost center or activity type. The previous step showed the switching structure, which assigns all cost center costs to the energy component. The following shows how the costs from the energy cost center 1230 are assigned to the corresponding energy component using the switching structure.
Procedure
Menu Path |
Accounting ® Controlling ® Cost Center Accounting ® Planning ® Set Planner Profile |
Transaction Code |
KP04 |
Field |
Europe |
North America |
Planner profile |
SAP104 |
SAP104 |
Menu Path |
From the Planning node, choose Activity Output/Prices ® Display. |
Transaction Code |
KP27 |
Field |
Europe |
North America |
Version |
0 |
0 |
From period |
1 |
1 |
To period |
12 |
12 |
Fiscal year |
2000 |
2000 |
Cost center |
1230 |
1230 |
Activity type |
* |
* |
Entry |
Free |
Free |
In the SwS column (switching structure), you can see the assignment of the IEN (IEY) switching structure (a switching structure is also assigned to cost centers 4100, 4110 and 4300).