Assigning Switching Structures in Activity Type Planning 

Use

This displays the assignment of a switching structure within activity type planning. The cost component structure was assigned to a plan version, and is therefore valid for all cost centers. You can also use the switching structure to make a differentiated assignment of costs to cost components for each cost center or activity type. The previous step showed the switching structure, which assigns all cost center costs to the energy component. The following shows how the costs from the energy cost center 1230 are assigned to the corresponding energy component using the switching structure.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    Accounting ® Controlling ® Cost Center Accounting ® Planning ® Set Planner Profile

    Transaction Code

    KP04

  3. Enter the following planner profile:
  4. Field

    Europe

    North America

    Planner profile

    SAP104

    SAP104

  5. Choose .
  6. Call up the transaction as follows:
  7. Menu Path

    From the Planning node, choose Activity Output/Prices ® Display.

    Transaction Code

    KP27

  8. Enter the following data:
  9. Field

    Europe

    North America

    Version

    0

    0

    From period

    1

    1

    To period

    12

    12

    Fiscal year

    2000

    2000

    Cost center

    1230

    1230

    Activity type

    *

    *

    Entry

    Free

    Free

  10. Choose .
  11. In the SwS column (switching structure), you can see the assignment of the IEN (IEY) switching structure (a switching structure is also assigned to cost centers 4100, 4110 and 4300).

  12. Choose until the overview tree appears.