Maintaining Switching Structures 
Use
We now describe how you can assign a cost center to a cost component. In this way, you can assign the costs of, say, the energy cost center into a cost component. To do this, you need to complete the previous step and be in the corresponding tree structure in Customizing.
Procedure
Menu Path |
From the Settings for Cost Component Split choose |
Transaction Code |
OKER |
In the TEI column, you can see that all components in the switching structure were assigned to component 70. The switching structure is assigned to the energy cost center within activity type planning.