Maintaining Switching Structures 

Use

We now describe how you can assign a cost center to a cost component. In this way, you can assign the costs of, say, the energy cost center into a cost component. To do this, you need to complete the previous step and be in the corresponding tree structure in Customizing.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    From the Settings for Cost Component Split choose for Define Switching Structure

    Transaction Code

    OKER

  3. Select the row for the IEN Energy Cost Center (IEY Energy Cost Center) switching structure.
  4. Choose Cost Components for switch layout.
  5. In the TEI column, you can see that all components in the switching structure were assigned to component 70. The switching structure is assigned to the energy cost center within activity type planning.

  6. Choose until the overview tree appears.