Additional Process Information 
The cost component split enables you to analyze which cost components are contained in the output prices of the activity types.
You can then control cost elements, cost element groups, and also entire cost centers in cost component splits. The corresponding cost center costs and the costs of the cost centers providing the activity are channeled into this cost component split. For example, if you have assigned the salary cost element to component 1 (salaries), then the system displays the salaries (for example, for a production cost center) in this cost component. If a plant maintenance cost center provides services to the production center, then the salaries for the plant maintenance cost center are assigned to this cost component.
Maintenance Cost Center |
Production Cost Center |
Splitting result for a production cost center |
Wages 10,000 |
Wages 20,000 |
Wages 30,000 |
Salaries 8,000 |
Salaries 7,000 |
|
Energy 10,000 |
Energy 10,000 |
Other cost components 35,000 |
You can also use this to assign entire cost centers into cost component splits. This requires a switching structure, in which you assign the cost centers (or parts of them). The result of our example could be as follows:
Maintenance Cost Center |
Production Cost Center |
Splitting result for a production cost center |
Wages 10,000 |
Wages 20,000 |
Wages 20,000 |
Salaries 8.000 |
Salaries 7,000 |
Maintenance 28,000 |
Energy 10,000 |
Energy 10,000 |
Other cost components 17,000 |
Cost component splitting is available for plan prices and actual prices. However, note that the cost component split is not possible if you are using manual prices. You can only use this for output prices that were determined iteratively.