Explaining Processing Steps for Variance Calculation 
The system displays the data for both activity types for cost center 4276.. For each activity type, you can see the operating rate, target costs, control costs and the variances..
You can see that the operating rate is 150% (plan quantity 400 h, actual quantity 600 h). You can also see the input price variance, input quantity variance, the resource-usage variance, and the remaining input variance. The system displays the variance categories separately for total, fixed, and variable variance costs.
.
.
.
Cost elements.In the top left of the screen, you can see the individual processing steps executed so far for this transaction. The last processing step, for example, was calculating the variances. You now choose the individual processing steps and note the effects.
For each cost element, the system displays the actual costs (represented here by the control costs) and the calculated target costs. The Variance column does not contain any values as these have only just been calculated in the last processing step. Note, for example, that the actual costs for cost element 403000 are still independent of activity. (Only the first row of the cost element displays actual costs, the second row for activity type 1420 does not yet display any.) The actual costs must first be assigned to the activity types. This occurs in the next two processing steps.
Note how the actual costs are broken down on the activity types. You now take a look at cost element 420000. The actual costs were allocated to activity type 1421 based on the target costs. In this activity type assignment, the cost element was planned only for activity type 1421, which means that the target costs for the cost element only exist on this activity type.
Note that the actual costs have not been split on the activity types for this cost element. As this cost element was planned as activity-type independent, no target costs exist on the activity types. You assign this cost element to the activity types in the next processing step.
The actual costs of cost element 449000 have been distributed to activity type 1421. For this cost element, we used a splitting structure to split the costs. You can use the explanation tool for a more detailed analysis (see:
Explanation Facility for Cost Component Splitting).The variance column still does not contain any values.
The last column now contains variances.
.In the dialog box, you can choose different display variants, although you can define the layout of the display fields as you require.
.