Displaying the Splitting Structure 
Menu Path |
Tools ® AcceleratedSAP ® Customizing ® Edit Project |
Transaction Code |
OKES |
SAP Reference IMG.
Define Splitting Structure.
Choose.You can see that two assignments (I01 and I02) have been defined in this splitting structure. These assignments contain the cost elements to be split, and the splitting rules. Any cost elements that are not entered here will be split using the equivalence numbers of the activity types.
:Field |
Europe |
North America |
Controlling area |
1000 |
2000 |
The system displays the selection criteria for the assignment. Assignment I01 applies to cost element 449000.
.This contains cost element 459000.
.
.
and
until the overview tree appears.