Additional Process Information 
Planned and actual cost splitting enables a more detailed breakdown of activity-independent costs to activity types than equivalence numbers. The bases for the distribution are:
· Activity quantities (planned and actual)
· Capacity (planned)
· Output (planned)
· Scheduled activity (planned)
· Statistical key figures on activity types (planned and actual)
The splitting is controlled by splitting structures. A splitting layout contains the rules (splitting methods) to determine which costs are to be split for each cost element or cost element group. The splitting structure is assigned to the cost centers for which the activity-type-independent costs are to be split.

Before you calculate the actual activity prices, you must already have split the actual costs.