Evaluating Costs and Quantities 

  1. Call up the transaction as follows:
  2. Menu Path

    From the Repetitive Manufacturing node, choose Evaluations ® CO Report Selection ® Summarized Analysis ® With Product Drilldown ® Variance Analysis ® Target/Actual Production Variances ® Cumulative

    Transaction Code

    S_ALR_87013139

  3. If the Set Controlling Area dialog box appears, enter 1000 for Europe and 3000 for North America and then choose .
  4. Enter the following data:
  5. Field

    Europe

    North America

    Plant

    1200

    3200

  6. Choose .
  7. The system displays an overview of the current costs incurred by the run schedule header (cost collector) and the difference between target costs and actual costs if there is any.

  8. Choose .
  9. In the dialog box, choose Yes.
  10. Call up the next transaction as follows:
  11. Menu Path

    From the Repetitive Manufacturing node, choose Evaluations ® LIS Statistics ® GR Statistics

    Transaction Code

    MCP8

  12. Enter the following data:
  13. Field

    Europe

    North America

    Plant

    1200

    3200

    Material

    L-40C

    L-40C

  14. Choose .

The system displays an overview with the quantity of goods received and the confirmed scrap ("actual scrap").