Entering or Changing the Planning in Repetitive Manufacturing 
Menu Path |
From the Production node, choose Repetitive Manufacturing ® Planning ® Planning Table ® Change Mode |
Transaction Code |
MF50 |
Field |
Europe |
North America |
Plant |
1200 |
3200 |
Period of examination: start to end |
Enter time interval in the future or confirm default |
Enter time interval in the future or confirm default |
Material |
Select |
Select |
Material |
L-40C |
L-40C |
A dialog box appears.
The Distribute Production Quantities dialog box appears.

Alternative Procedure
You can also generate the production plan through master production scheduling (MPS).
Menu Path |
From the Production node, choose Production Planning ® MPS ® MPS ® Single-Item, Multi-Level |
Transaction Code |
MD41 |
Field |
Europe |
North America |
Material |
PG-BULB-C |
PG-BULB-C |
Plant |
1200 |
3200 |
Scope of planning / Product group |
Select |
Select |
Processing key |
NETCH |
NETCH |
Create purchase req. |
2 |
2 |
Delivery schedules |
3 |
3 |
Create MRP list |
1 |
1 |
Planning mode |
3 |
3 |
Scheduling |
2 |
2 |
Also plan unchanged components |
Select |
Select |
Display material list |
Select |
Select |
To skip the information dialog box, simply choose
.
Capacity Leveling
Menu Path |
From the Production node, choose Repetitive Manufacturing ® Planning ® Planning Table ® Change Mode |
Transaction Code |
MF50 |
Field |
Europe |
North America |
Plant |
1200 |
3200 |
Period of examination Start / end |
Interval in the future |
Interval in the future |
Selection by production version |
Production line (select) |
Production line (select) |
Production line |
L-1000 |
L-1000 |
The capacity view of the planning table for repetitive manufacturing appears.
If you change the run schedule quantities of the individual products, the capacity load of the line is changed accordingly. In this way, you can perform capacity leveling.