Maintaining the PI Sheet for Inspection 

  1. On the Find PI sheet screen, enter the following data:
  2. Field

    Data

    Control recipe

    Control recipe number for destination L1

    Alternatively, search by
    Plant
    Ctrl rec.destination
    Material number


    1100
    L1
    CH_4100

    All other entry fields

    Delete default values

  3. Choose .
  4. Double-click your process order number to select the PI sheet.
  5. Choose PI sheet ® Display -> Maintain.
  6. To call up results recording for Quality Management, double-click Record inspection results (yellow) in phase 410 /, process instruction 0010.
  7. Choose .
  8. On the Record Results: Characteristic Overview screen, double-click inspection characteristic 010, Degree of hardness to get to the Record Results for CH_4100: Characteristic Single Screen.
  9. Enter the following data:
  10. Field

    Data

    Mean value

    Valid measured value that lies within the upper and lower tolerances

  11. Choose . The status of the line is set to 5 (Processing is completed), and the characteristic is accepted () since the measurement value was within the tolerances.
  12. Choose . You now see characteristic 020.
  13. On the Record Results for CH_4100: Single Values for Characteristic screen, enter the following data:
  14. Field

    Data

    Measured value

    Valid measured value that lies within the upper and lower tolerances

  15. Choose . The status of the line is set to 5 (Processing is completed), and the characteristic is accepted () since the measurement value was within the tolerances.
  16. Choose .
  17. You return to the PI Sheet: Maintain screen.

  18. Enter the signature for the end of phase 410.
  19. Field

    Data

    Phase end 0410

    Your user ID

  20. Choose .
  21. Choose PI sheet ® Set to complete.
  22. Choose until the overview tree appears.