Maintaining the PI Sheet for Production 
Use
You can find more information about this process under
Procedure
Menu Path |
From the Process Management node, choose PI Sheet ® Find |
Transaction Code |
CO60 |
Field |
Data |
Control recipe |
Control recipe number for destination P1 |
Alternatively, search by |
|
All other entry fields |
Delete default values |
Field |
Data |
Phase start 0110 |
Your user ID |

Once you enter the signature, no more changes can be made. The system also blocks the entry fields for the material withdrawal.

Choose the value help to call up a proposal for the material quantity to be consumed by the relevant component, the batch from which it is to be taken, and the storage location. The data is transferred from the process order. If the material is not subject to batch management, the Batch number field remains empty.
Field |
Data |
Material |
CH_1302 |
Material quantity (batch number/storage location) |
Choose the value help, then choose |
Material |
CH_4103 |
Material quantity (batch number/storage location) |
Choose the value help, then choose |
Material |
CH_1103 |
Material quantity (batch number/storage location) |
Choose the value help, then choose |
Material |
CH_1104 |
Material quantity (storage location) |
Choose the value help, then choose |
Material |
CH_4102 |
Material quantity (batch number/storage location) |
Choose the value help, then choose |
Material |
CH_1105 |
Material quantity |
Choose the value help, then choose |
Material |
CH_4101 |
Material quantity |
Choose the value help, then choose |
Material |
CH_1306 |
Material quantity (storage location) |
Choose the value help, then choose |

If you assigned multiple batches during batch determination, the system displays entry fields for the material quantity, the batch number and for the storage location for each batch.
Field |
Data |
Phase end 0110 |
Your user ID |
Field |
Data |
Phase start 0120 |
Your user ID |
Field |
Data |
Temperature |
30 |
Temperature |
40 |
Field |
Data |
Phase end 0120 |
Your user ID |
Field |
Data |
Phase start 0130 |
Your user ID |
Field |
Data |
Phase end 0130 |
Your user ID |
Field |
Data |
Phase start 0140 |
Your user ID |
Field |
Data |
Mean value |
Valid measured value that lies within the upper and lower tolerances |
You return to the PI Sheet: Maintain screen.
Field |
Data |
Phase end 0140 |
Your user ID |
Field |
Data |
Phase start 0210 |
Your user ID |
Field |
Data |
Phase end 0210 |
Your user ID |
Field |
Data |
Phase start 0220 |
Your user ID |
Field |
Data |
Mean value |
Valid measured value that lies within the upper and lower tolerances |
You return to the PI Sheet: Maintain screen.
Field |
Data |
Phase end 0220 |
Your user ID |
Field |
Data |
Phase start 0310 |
Your user ID |
Field |
Data |
Phase end 0310 |
Your user ID |
Field |
Data |
Phase start 0320 |
Your user ID |
Field |
Data |
Phase end 0320 |
Your user ID |
Field |
Data |
Phase start 0330 |
Your user ID |
Field |
Data |
Report yield: |
Choose the value help, then choose |
Field |
Data |
Phase end 0330 |
Your user ID |