Use
The control recipe contains all of the process instructions required to execute a process order. The R/3 System creates one control recipe (PI sheet) for production and one for the inspection. The following functions are performed: generate process instructions automatically, trigger control recipe creation.
Procedure
Menu Path |
Logistics ® Production - Process ® Process Order ® Process Order ® Change |
Transaction Code |
COR2 |
Field |
Data |
Process order |
Your number: accept default |
The system created a control recipe for destinations L1 and P1.
In the dialog box, choose Yes.