Additional Process Information 

Three components are managed in the warehouse management system. You can see this in the process order under the special withdrawal storage location ‘088’. Together with the goods receipt for the order, the WM stores the components in the background on the storage locations planned for the materials. Production then requires the material staging of the components to a production storage bin. You create a transfer requirement in WM. The transfer requirements from production are then converted into transfer orders in WM. In this process, we create the transfers online and convert them manually into a transfer order. You could also process them automatically. A confirmation in WM confirms the successful transfer, and you also confirm to the process order which batch of materials CH_4102 has been transferred by the WM. The stock transfer can be traced in the WM stock overview. From an MM Inventory Management perspective, the R/3 System has not posted anything. The stock is still listed at storage location 088.