Evaluating MRP and Creating the Process Order 

Use

From the current stock/requirements list, the system converts a planned order into a process order. By creating the process order, the system generates an order for the manufacture of a material or a batch that includes all of the data relevant for production based on a master recipe. The following functions are carried out: determine master recipe (through the production version in the planned order), schedule process order, determine planned costs, create batch master record for the material to be produced, carry out batch determination for the components.

Procedure

  1. Call up the transaction as follows:
  2. Menu Path

    Logistics ® Production – Process ® MRP ® Evaluations ® Stock/Requirements List

    Transaction Code

    MD04

  3. Enter the following data:
  4. Field

    Data

    Material

    CH_4100

    Plant

    1100

  5. Choose .
  6. Choose for the first planned order (PlOrd.) you want to convert.
  7. Choose -> Proc. order (Convert planned order into process order).
  8. The system generates a process order. The Create Process Order: Header – General Data screen appears.

  9. Choose the Master data tab.
  10. In the ProdVersion field, check whether a master recipe has been determined. This is indicated by the value 1 (Production version).

  11. To schedule the order, choose .
  12. Choose Operations.
  13. On the Create Process Order: Operation Overview screen, select operation 100 and its phases (110-140) to check scheduling.
  14. Choose .
  15. Choose the Dates tab.
  16. Choose .
  17. Choose the Goods recpt tab. You can now create the batch that is to be produced with this order.
  18. On the Create Process Order: Header - Goods Receipt screen, enter the following data:
  19. Field

    Data

    Batch

    CH_C any three-character number

  20. Choose .
  21. If this batch master record does not yet exist, the Batch Handling dialog box appears. Choose Yes.

  22. Note the batch number.
  23. Choose .
  24. Choose .
  25. You can now check whether the planned order has been converted into a process order.

  26. Note the order number.
  27. Choose until the overview tree appears.