Additional Process Information 
In the earlier planning steps, you create planned orders. From the current stock/requirements list, the system converts a planned order into a process order. This triggers the creation of a production order for the manufacture of a batch that includes all of the data relevant for production based on a master recipe.
You can then make any changes or corrections required to release the process order (for example, resource selection or batch determination). When you release the order, the system checks whether an order can be released for production processing. The system also starts batch determination for several components. When you save the process order, the system generates an inspection lot in quality control.

Batch determination is triggered in the process order. It is possible for the system to find and transfer more than one batch. If such a batch split occurs, you cannot use material quantity calculation in the standard system. A customer-specific program is required. We use a user exit for this purpose. Do not execute material quantity calculation in this IDES process, because it refers only to the standard system.