Checking Requirements Using MRP 
Menu Path |
Logistics ® Production ® MRP ® Evaluations ® Stock/Requirements List |
Transaction Code |
MD04 |
Field |
Data |
Material |
P-401 |
Plant |
1000 |
The sales order and production order are displayed as separate planning segments (sales order stock, sales order, and production order).
A dialog box appears.
The system displays the assigned sales order in the Sales order section.
If all materials are available, continue with step 22. If some of the materials are not available, the Availability Check dialog box appears.
You see that sufficient quantities of the material are available at another storage location.
Field |
Data |
SLoc |
0002 |
The system confirms that all materials are available.