Menu Path |
Logistics ® Sales and Distribution ® Sales ® Order ® Create |
Transaction Code |
VA01 |
Field |
Data |
Order type |
OR (standard order) |
Sales organization |
1000 |
Distribution channel |
10 |
Division |
00 |
Field |
Data |
Sold-to party |
1000 |
Purch.order no. |
K-BE-(any six character number) |
Req.deliv.date |
Confirm default |
Material |
P-502 |
Order quantity |
1 |
To confirm any information messages, choose
.
The Characteristic Value Assignment screen appears. First assign values to the required characteristics.
Field |
Data |
Pump for |
03 (water) |
Mode |
02 (electric) |
Pump type |
02 (rotary pump) |
Maximum pump lift |
7 |
Pump capacity |
60 |
Rotation direction |
01 (clockwise) |
Model of the pump |
02 (adjustable) |
Options |
With support foot With drawing |
The simulated BOM explosion is displayed on the Configuration: Result screen.

You now see the structure of the model in a dialog box. In this case, configuration and value assignment are executed both in the header item and in the subitems. The shaft assembly (item 502-300) is configurable. Multiple value assignments are possible for the casing (item 500-100) and the crate for the pump (item 500-800).
Field |
Data |
Packaging |
01 (cardboard) |

A second item is created and displayed in the sales order for 500-800. This item is marked as relevant to sales in the BOM.

Make a note of the material availability date, as you will need this as a selection criterion to create the delivery. If the transport. planning date is earlier than the material availability date, you can create the delivery on this date. You can also see the shipping point responsible for delivering this order.
The sales order number is displayed in the status bar. Write down this number.
In the dialog box, choose No.