Menu Path |
Logistics ® Sales and Distribution ® Sales ® Order ® Create |
Transaction Code |
VA01 |
Field |
Data |
Order type |
OR |
Sales organization |
1000 |
Distribution channel |
10 |
Division |
00 |
Field |
Data |
Sold-to party |
1000 |
Purch. order no. |
K-BE-(any six character number) |
Req.deliv.date |
>1 month in the future |
Material |
P-500 |
Order quantity |
1 |
The Partner Selection dialog box appears. To select a goods recipient (first line), choose
.
To skip any information messages, choose
.
The Characteristic Value Assignment screen appears.
Material Configuration
Field |
Data |
Pump for |
01 |
Mode |
02 |
Pump type |
01 |
Rotation direction |
01 |
Part 2/Model of the pump |
02 |
Part 2/Connection |
03 |
You see the net value at the bottom of the screen.
Field |
Data |
Part 1/Maximum pump lift |
5,00 m |
Part 1/Maximum working pressure (bar) |
5,000 |
Part 1/Pump capacity |
60 |
Part 2/Range |
01 |
Part 2/Options |
With support With drawing |
The system displays a change in the net value.
In the dialog box, you see an overview of the resulting variant conditions. The net value is calculated using the basic value and the individual characteristics.
The Create Standard Order: Overview screen appears.
Availability check
The Create Standard Order: Availability Check screen appears.
The system informs you that the availability check has been completed successfully.
If you want to run the process up to the delivery, execute the following steps:

Make a note of the Material availability date, as you will need this as a selection criterion to create the delivery. If the Transport planning date is earlier than the material availability date, you can create the delivery on this date. You can also see the shipping point responsible for delivering this order.
The sales order is displayed. Note this number.
In the dialog box, choose No.