Scheduling the Collective Order 

  1. Call up the transaction as follows:
  2. Menu Path

    From the Production node, choose Production Control ® Order ® Change

    Transaction Code

    CO02

  3. Enter the following data:
  4. Field

    Data

    Order

    Your production order number

    Display overview

    Select

  5. Choose .
  6. Choose Read collect. order.
  7. Double-click material number 400-100.
  8. Change the basic order dates. To do this, enter the following data:
  9. Field

    Data

    Basic dates

    - Finish

    - Start

    A date in the future (however, before the requirements date)

  10. Choose .
  11. To skip any warning messages, choose .
  12. Choose Goto ® Logs ® Scheduling.
  13. A log may already have been generated. Analyze this log. If no log exists, choose .

  14. Choose .
  15. Remain on this screen.