Make-To-Stock Production 

This IDES process describes integration with downstream application areas, simple planning, and complete production order processing.

Purpose

This process describes the planning of a product for make-to-stock production. After requirements planning, you analyze the stock situation and convert a planned order into a production order. You also enter a sales order that is not relevant to the planning. The production order is then released and saved. After the material has been withdrawn, the operations are confirmed. The sales order is delivered and settled.

Prerequisites

If you need to create the necessary starting situation for this process, choose .

Process Flow

You can find the data for this process under .

  1. Planning a Product
  2. Creating a Sales Order
  3. Executing Multi-Level Requirements Planning
  4. Converting the Planned Order into a Production Order
  5. Withdrawing the Material for the Production Order
  6. Confirming a Production Order
  7. Creating a Delivery
  8. Creating a Billing Document