Menu Path |
Logistics ® Production ® Production Control ® Order ® Create ® With Material |
Transaction Code |
CO01 |
Field |
Europe |
North America |
Material |
P-103 |
P-103 |
Production plant |
1000 |
3000 |
Order type |
PP01 |
PP01 |
.Field |
Europe |
North America |
Total quantity |
1 |
1 |
Basic dates - finish |
A date at least 4 days in the future |
A date at least 4 days in the future |
Scheduling type |
Backwards |
Backwards |
.
Detailed display to display the alternative sequences.
.
.
.The operation number indicates whether you have chosen external processing with (operation 31) or without providing material (operation 30).
to determine which materials you want to provide to the subcontractor..
.Field |
Data |
To OpAc |
0031 or 0030 |
.
.The order number is displayed in the status bar. Write the number down.
.