Show TOC
Assign Shipping
Points
In this menu option, you allocate the shipping
points to the desired combinations of shipping condition and loading group for
each plant.
Requirements
Before you can allocate the shipping points,
you have to define plants, shipping points, shipping conditions, and loading
groups. For information on this subject, see the following menu
options:
- Plants are defined as organizational units of
Materials Management (module MM) in menu option
"Create plant".
Actions
1. Check how
the shipping points within a plant should be allocated to the shipping
conditions and loading groups.
2. Make the
allocation for the individual plants.
Set an indicator for
the shipping point which should appear in the item of the sales document as a
default value. You can specify manually the other shipping points allocated
here in the item of the sales document.