Show TOC

Assign Shipping Points

In this menu option, you allocate the shipping points to the desired combinations of shipping condition and loading group for each plant.

Requirements

Before you can allocate the shipping points, you have to define plants, shipping points, shipping conditions, and loading groups. For information on this subject, see the following menu options:

Actions

1. Check how the shipping points within a plant should be allocated to the shipping conditions and loading groups.
2. Make the allocation for the individual plants.
Set an indicator for the shipping point which should appear in the item of the sales document as a default value. You can specify manually the other shipping points allocated here in the item of the sales document.