To create a subcontract order, proceed as follows:
Press
– You do not need to enter the date required for the components. This date is proposed by the system when you press
ENTER . It is calculated as follows:Delivery date of the item - Planned delivery time
– If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
– You can determine whether the components are available on the date required by selecting Edit
® Availability check.If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item ® Component ® New BOM explosion. The existing components are deleted and redetermined in the bill of material.