Creating and Deleting Manual Assignments 
Use
On the Manual assignment screen in BOM transfer, you can manually perform more assignments or change the existing assignments.
On the left-hand side of the list you see all the BOM items that could not be automatically assigned. By choosing
view you can switch between:
On the right-hand side you see all the network activities in the project. These activities can be in several networks.
Prerequisite
You have executed the
BOM transfer assignment program.Manually Assigning Components
. BOM items that have been assigned are no longer displayed.
. A dialog box appears.
Deleting Existing Assignments
Results.The system displays a list of all the previous assignments containing all the BOM items that have been automatically or manually assigned.
.The item will then appear in the list of components that can be manually assigned.
Displaying the Activity and BOM Item Overviews
Results.
Network activities or
BOM items.The overview of either the network activities or BOM items appears together with the reference points.
You can switch between the list of results, the Manual assignment screen and the overview of the network activities and BOM item as often as you like.
Confirming Assignments
To confirm the new or changed assignments, save your data.
If you have not predefined
priorities in inventory management , the system will display a dialog box where you can choose the appropriate stock.Result
The BOM items are assigned to the network activities and if applicable the
corresponding (preliminary) requirements are generated.