Planning Table (PP-REM)
   Run Schedule Quantity
   Planning with the Planning Table
      Accessing the Planning Table
         Accessing the Planning Table by Lines
         Accessing the Planning Table by MRP Controller
      Detailed Material Selection (Accessing the Collective Display)
         Sorting Materials in the Collective Display
         Finding Materials in the Collective Display by Exception Message
      Processing Production Quantities
         Selecting Rows and Columns
         Assigning ‘Not Yet Assigned’ Quantities Manually
         Assigning ‘Not Yet Assigned’ Quantities Automatically Over a Per
         Reassigning ‘Already-Assigned’ Quantities to Another Production
         Reassigning ‘Already-Assigned’ Quantities
         Increasing/Reducing Production Quantities Over a Period of Time
         Moving Production Quantities on the Time Axis
         Creating Quantities According to Production Rates (Line Filling)
         Transferring Requirements
         Transferring Smoothed Requirements
         Changing Quantities Directly in the Planning Table
         Changing Quantities in the Details Screen
      Displaying Quantities Over Several Periods
         Changing the Quantity Distribution Display
      Distributing Planned Orders to a Daily Rate
      Distributing Planned Orders to Shifts
      Displaying Additional Information in the Planning Table
         Displaying Pegged Capacity
         Displaying Pegged Requirements
         Displaying Material Data
         Displaying Coverages
         Transferring Data to Microsoft Excel
      Processing Aids for the Planner in the Planning Table
         Saving your Settings in the Initial Screen
         Scrolling Horizontally and Vertically in the Planning Table
         Changing the Time Bucket
         Accessing Detailed Information
      Disaggregated Display of the MRP Segments
      Processing Planned Orders in the Planning Table
      Multi-Plant Planning
         Planning Production in an Alternative Plant
      Converting Planned Orders into Production Orders or Process Orde
      Processing Production Orders in the Planning Table
      Updating Component Requirements
      Accessing the Planning Table by MRP List
         Accessing the Planning Table by MRP List
      Planning Table and Sequencing
         Accessing the Planning Table with Sequencing Using the Line Hier
         Rates and Takt Times
         Takt-Based Scheduling
            Example 1 for Takt-Based Scheduling
            Example 2 for Takt-Based Scheduling
            Example 3 for Takt-Based Scheduling
         Accessing the Graphic
            Dispatching, Deallocating and Rescheduling Manually
         Line-On/Line-Off View of Orders
         Selecting Line Segments
            Defining Planning Segments
               Defining the Planning Segment
            Defining Planning Visualization Segments
               Defining the Visualization Segment
         Totals Display
         Changing or Displaying the Operative Production Rate / Takt Time
      Planning Table and Capacity Planning
         Scheduling in the Planning Table
         Capacity Planning in the Planning Table
            Displaying Capacity Data for the Production Line in the Planning
            Changing the Capacity Display
            Defining Capacity Segments
            Capacity Planning Using Personnel in the Planning Table
            Capacity Planning Example in the Planning Table
         Dispatching Planned Orders in the Planning Table
         Working with the Capacity Planning Table
            Activating and Exiting the Capacity Planning Table
      Printing the Planning Results
         Printing the Planning Results