Revaluating Planning 

Use

The SAP R/3 System does not automatically revaluate plan data that was entered manually at the cost center level in the case of exchange rate changes. To ensure up-to-date plan values, you have to start the revaluation of your planning manually. A function is available with which you can revaluate plan costs as well as plan prices.

The SAP R/3 System requires a leading currency in order to revaluate your plan data. The system then uses this leading currency as the basis for the revaluation. Plan data in the leading currency is not changed by the system in the case of exchange rate differences, but the other values are recalculated.

During revaluation of plan values, the SAP R/3 System takes the following accounting transactions into consideration: