In this step, you specify which data is contained in an operation that is automatically created during order creation.
Within order creation, you can determine that an operation is created automatically if no routing exists for the material to be produced or no routing can be selected.
The automatically created operation should contain the following data, for example:
Specify the data for operations automatically created by the system.