Supplying R/3 Time Management with Operative Planned Working Time 

Use

You can use this function to transfer operative planned working time that was recorded in an external time management system to R/3 Time Management.

Prerequisites

The time management system must first be supplied with HR master data. Two options for transferring master data are as follows:

  1. Data transfer using the Interface-Toolbox
  2. A delta download providing the external system with master data takes place in this version of data transfer. The Interface Toolbox enables you to store master data in files that match the table structure of the external system. In this way, the tables of the external systems do not have to be modified to match the structures.

  3. Data transfer using Master Data Distribution via IDocs

In this version of data transfer, all HR master data is replicated. In the external system, the applicable tables must be modified to match the structures of the IDocs. The ALE Distribution Model must always be maintained.

Features

The transfer of operative planned working time to R/3 Time Management is asynchronous. The data is stored per IDoc in the interface tables PTEXDIR, PTEX2003GEN, and PTEX2003SPEC.

The report RPTEXTPT (Transfer External Data ® Human Resources) reads data from the interface tables PTEX2003GEN and PTEX2003SPEC and stores it in the Substitutions infotype (2003). The system generates records for the Substitutions infotype (2003).