Show TOC
settlement
control
Definition
Specifies how the material price determination
should procede.
You have the following options:
- With price control V in
activity-based material price determination
(indicator2 in the material master), the moving
average price is calculated. With price control S, the material is valuated
with the standard price and the moving average price is calculated for
information purposes.
- In
single-/multi-level material price determination(indicator
3 in the material master), the valuation price
(standard price) remains unchanged and a periodic unit price is calculated for the closed period.
This option is only for materials with price control indicator
S ,and is only recommended if in addition to multiple currencies
and/or valuations, you use single-/multi-level material price
determination.
In single-/multi-level material price determination, a periodic unit price is
updated for information, but it can only be used for material valuation in the
closed period.
Dependencies
The indicator is only of use if the
material ledger is active.
Upon activating a valuation area for the
Material Ledger in Customizing, you can enter what type of material price
determination will be proposed when creating a material in that valuation
area. This proposal will be ignored at production startup: the system
automatically sets the indicator to 2 in the
material master for all materials present.
If you want to change the indicator for a
particular material later, choose Accounting -> Controlling -> Actual
Costing/Material Ledger -> Environment -> Change Material Price
Determination.