Show TOC

settlement control

Definition

Specifies how the material price determination should procede.

You have the following options:

Dependencies

The indicator is only of use if the

material ledger is active.

Upon activating a valuation area for the Material Ledger in Customizing, you can enter what type of material price determination will be proposed when creating a material in that valuation area. This proposal will be ignored at production startup: the system automatically sets the indicator to 2 in the material master for all materials present.

If you want to change the indicator for a particular material later, choose Accounting -> Controlling -> Actual Costing/Material Ledger -> Environment -> Change Material Price Determination.