Show TOC

flow variants

Use

In this list field, you can choose one of the following variants for inspection point completion:

Variant 1: Quantity, Valuation, and Cofirmation (production)

The valuation screen for the inspection point is either called up automatically after the inspection characteristics have been closed when you exit the characteristic overview screen, or you can call up the screen manually using the function key.

You must assign a quantity and valuation to the inspection point.
Depending on the control key used for the operation, the system suggests a confirmation indicator (for example, partial confirmation, final confirmation, or "no confirmation" for the order)

Variant 2:Quantity, Valuation (production)

The valuation screen for the inspection point is called up automatically after the inspection characteristics have been closed, or you can call up the screen manually using the function key.

You must assign a quantity and valuation to the inspection point.
The confirmation indicator is set to "No confirmation". However, you can activate the confirmation despite this setting if you have set the control key accordingly.

Variant 3: Valuation

The valuation screen for the inspection point is called up automatically after the inspection characteristics have been closed, or you can call up the screen manually using the function key.

You must only assign a valuation to the inspection point.

Variant 4: Automatic Valuation Based on Inspection Point Definition

The valuation screen for the inspection point is not called up after the inspection characteristics have been closed.

The inspection point is valuated automatically using the inspection point definition.

Note

The valuation screen is always called up, if you:

Procedure

Assign the relevant variants to the inspections:

Variants 1 to 4

Variants 3 or 4