Show TOC
Define
Allocation Structure
If the assessment for each segment is not made
with a pre-defined assessment cost element, you can assign the source cost
elements to the desired assessment cost element in the
allocation structure . During cycle definition, enter the
allocation structure instead of an assessment cost element in the
segment.
An allocation structure for the assessment
consists of at least one assignment, stating the assessment cost element to
which the source element is assigned. The original cost elements will already
have assignments in the source.
Requirements
To define the assessment cost elements required
for the allocation structures, you must first complete the IMG activity
"Create Assessment Cost Elements".
Activities
1. Creating an
allocation structure.
To create an
allocation structure, proceed as follows:
a) Choose "New
Entries".
b) Enter a name
and text for the allocation structure.
c) Save the
allocation structure.
2. Enter the
assignments for each allocation structure.
To make the
assignments, proceed as follows:
a) Select the
allocation structure, and then choose "Assignments".
b) Choose "New
Entries".
c) Enter a name
and text for the assignment.
d) Save the
assignment.
3. Specify the
source for each assignment.
To specify the
source for an assignment, proceed as follows:
a) Select the
assignment, then choose "Source".
b) Enter a cost
element interval or a cost element group.
c) Save the
source.
4. Enter the
assessment cost element for each assignment.
To specify an
assessment cost element for an assignement, proceed as follows:
a) Select the
assignment, then choose "Assessment cost element".
b) Enter the
assessment cost element you require.
c) Save your
entries.