Evaluation Lists: Display of Exception Messages Standardized
Scope of Functions
Up to now, less exception messages were displayed in the stock/requirements list than were displayed in the
MRP list. These display lists and the corresponding processes have been
brought into line, as far as possible. The most important changes are:
- Exception message 30 Plan process according to schedule only
existed in the MRP list. It is now in the stock/requirements list too.
- Up to now, you had to trigger the rescheduling check in the stock/
requirements list. It is now done automatically by the system, as was
already the case in the MRP list and the collective display of the
stock/requirements list. The corresponding exception messages appear immediately.