Show TOC

Availability Check

In this section, you make the settings which are important for checking the availability of material components in a production order.

To carry out a material availability check you need a checking group and a checking rule.

You allocate the checking group to the individual material in the material master. You specify the checking rule for each application. Together, the checking group and checking rule determine the scope of the check.