Show TOC

material component

Product Cost Controlling (CO-PC)

Material that does not have its own bill of material (BOM).

Product Cost Planning makes a distinction between assemblies (materials that have BOMs) and material components (materials that do not have BOMs).

Because this distinction is not necessary in Production Planning, both types of materials are called material components there.