Show TOC
Material Ledger
Description
The following functions are new:
- Using a variant, you can now schedule in the background the conversion of
data for production start-up of the Material Ledger.
- The list issued for closing materials for a plant has also been
improved.
- If variances occur in a purchase order for subcontract work, you can now
subsequently adjust the costs for all materials. Previously this was only
possible for raw materials.
- The following authorization objects exist for the Material Ledger:
- K_MLNUSER
This authorization object is for users who are allowed to close specific
materials and display material ledger master data.
You can determine the valuation areas in which this object is to apply.
- K_MLPUSER
This authorization object is for users who are allowed to close the Material
Ledger for a plant.
You can determine the valuation areas in which this object is to apply.
The authorization objects for the Material Ledger can be found in the
authorization class Controlling.
If you wish to release marked standard cost estimates when you close the
Material Ledger, you also require the authorization object
K_FVMK (class Controlling). If you do
not have this, the marked standard cost estimate will be ignored. The price on
closing the Material Ledger will be updated in the material master record.
If you wish to convert data for the Material Ledger, you require authorization
object S_TABU_DIS. (class Basis -
Administration)
- In the R/3 library the MM - Material-Ledger
documentation has an index.
Installation information
The Material Ledger is only available by prior arrangement with SAP.
Change system parameters in customizing
If you use the Material Ledger, you must
Maintain authorizations
Maintain profiles
Further notes
Please refer to MM - Material Ledger in the R/3
library.