Show TOC

alternative determination

Production Planning and Control (PP)

The system automatically determines which alternative in a multiple BOM is required with a multi-level BOM explosion.

The search process is controlled by the "application" entered (applications are defined in Customizing) and additional selection criteria as appropriate.