Scheduling a Job 

Prerequisites

You have created a variant of the report program RMCADATA that uses dynamic date calculation to specify an analysis period.

Procedure

Carry out the following steps in the Computing Center Management System (CCMS).

  1. Define a job with the job class A.
  2. Create a step in which the variant you have defined for the ABAP program RMCADATA is executed.
  3. Schedule the job periodically. Specify the length of the period so that it matches the analysis period set by the variant.