Detailed Reports for Materials 
Definition
Reports based on the data of the existing material cost estimates in the system
Use
In the selection screen, you can directly enter the cost estimate data for the report you are calling up or search for it with
Cost Estimate.
Before calling up the report, you can make a number of settings (some of which you can change in the report) in the selection screen:
Currencies in Costing). To do so, choose Settings ®
Currency...
.If you want to have multiple low-level codes displayed in the itemization, choose Settings ®
BOM Explosion. You can also specify that only material items should be displayed. You can have an additional field Level displayed that shows the low-level codes of the respective report lines.See also:
Cost Estimate with Quantity Structure
Cost Estimate Without Quantity Structure
Special Processing with Mixed Costing
Features of the ABAP List Viewer
Creating, Changing, and Managing Layouts