Maintain PA
Transfer Structure
In this activity, you define the structures to
be used to settle actual and planning data for orders and projects.
Although it is technically possible, via a
joint maintenance dialog, to use the same PA transfer structures from
different allocation types in settlement, you should instead define separate
PA transfer structures.
Actions
1. Select the
function "New entries" and enter an abbreviation and a name for your PA
transfer structure.
2. Divide your
cost elements according to how you want to group them in Profitability
Analysis, and create assignment lines accordingly. These assignment lines are
then used to transfer the cost elements to CO-PA value fields.
The indicator for
quantity billed/delivered is relevant for settling sales orders and projects.
Select this indicator for the particular assignment line with which the billed
quantity is to be transferred to CO-PA. Under "Value fields", you need to
assign a CO-PA quantity field (quantity/value indicator "2") to such an
assignment line for the billed quantity. During settlement to CO-PA, the
billed amount is transferred to the assigned field.
3. For each
assignment line, enter into the order/project the cost element(s) or the cost
element group to be assigned. You should usually activate the "Costs/Revenues"
option as the source. The "Variances on production orders" option is only
relevant for the settlement of production orders. In the latter case, you
should define a separate operating concern (see the section "
Define PA Tranfer Structure for Variance Settlement"). The
"Accounting indicator from SM orders" option is only relevant for the
settlement of service orders.
1. For each
assignment line, enter the value field (or, if costs are split into fixed and
variable portions, both value fields) into which the entered costs are to be
imported.