Planning Requirements for Inspection Lot Creation 
This example shows how the system responds when it creates an inspection lot, depending on which planning activities were completed.
The first table below provides an overview of several examples (cases) in which different combinations of planning steps were completed. The second table shows how the system responds in each case.
Planning Steps |
Case 1 |
Case 2 |
Case 3 |
Case 4 |
Case 5 |
Case 6 |
Case 7 |
Was the inspection type assigned to the order type? |
No |
Yes |
Yes |
Yes |
Yes |
Yes |
Yes |
Was the maintenance task list assigned to an order? |
- |
No |
Yes |
Yes |
Yes |
Yes |
Yes |
Did you specify the field combination for inspection points in the maintenance task list? |
- |
- |
No |
Yes |
Yes |
Yes |
Yes |
Does the control key for the operation specify inspection characteristics? |
- |
- |
- |
No |
No |
Yes |
Yes |
Have inspection points been assigned to the operation? |
- |
- |
- |
No |
Yes |
No |
Yes |
|
See item 1 below |
See item 2 below |
See item 3 below |
See item 4 below |
See item 5 below |
See item 6 below |
See item 7 below |
Case / Item |
System response |
1 |
The inspection lot is not created. |
2 |
The inspection lot is not created and the system records the status ILNC (inspection lot not created) in the maintenance order. |
3 |
The system creates the inspection lot and records the status ILCR (inspection lot created) in the maintenance order. In addition:
In this case, maintain the inspection point in the maintenance task list; then call up the function to change an inspection lot to create the inspection specifications. |
4 |
The system creates the inspection lot and records the status ILCR (inspection lot created) in the maintenance order. In addition:
|
5 |
The system creates the inspection lot and records the status ILCR (inspection lot created) in the maintenance order. In addition:
|
6 |
The system creates the inspection lot and records the status ILCR (inspection lot created) in the maintenance order. In addition:
|
7 |
The system creates the inspection lot and records the status ILCR (inspection lot created) in the maintenance order. In addition:
|